To cement and respray the complete trailer.
To oxy-cut and chisel out the turntable plate and replace the new plate and reweld.
To oxy-cut and chisel out 1 pc. I-beam and replace the I-beam.
To oxy-cut and chisel out the rear protection bar, vertical beam, plate and replace the rear protection bar.
To oxy-cut and chisel out 1 pc of container twist lock and replace the new lock and reweld.
To remove and replace the side guard.
To hydraulic jack and straighten the both main chassis frame and realign to position.
To remove and replace the landing leg.
To replace the air pipe and check the air system.
To remove and replace the rear spring bracket,spring equalizer bush,equalizer arm and reweld and replace the spring assy.
To remove the trailer air pipe and trailer chassis wire harness effect to repair the chassis frame and refix same.
To remove the both crane lifter,centre hydraulic cylinder and lift down to effect repair the chassis frame.
To remove the LHS & RHS mudguard,replace with new parts supplied and reweld same.
To remove and replace the rear air bellow and check the suspension system.