To cement and respray painting on the front cabin, inner and outer accident parts, and the chassis frame.
To completely remove and lift out the cabin.
To disconnect the wiring, brake pipe, hoses, and cabin lock inorder to remove the cabin and check EDC wiring.
To hydraulic jack and straighten the prime mover two main chassis frame and realign same.
To realign and measure the two chassis frames on the measuring bench.
To refix the air funnel, bumper, side mirror, windscreen glass and all the accessories and make good to the prime mover.
To refix the air-cond system and refill air-cond gas.
To refix the recond cabin supplied and reconnect all the wiring system, brake piping, joint and adjusting and evaluate the cabin tilting system.
To remove the damaged front, rear suspension, and replace the new parts, adjusting and refix same.
To remove the exhaust pipe, refix with new exhaust pipe, and weld the broken parts.
To remove and replace the intercooler, radiator and check the system.
To replace all the side mudguard, rear mudguard, bracket and knock and weld those joint, to readjust the parts to position.
To hire crane and lift the overturned vehicle.
To remove engine, gear box to effect repair and refix after repair.
To remove and replace the concrete mixer drum and check the hydraulic to working condition.
To oxy cut and chisel out the mixer drum sub-frame and replace new sub-frame and reweld.
To remove and replace the new ladder and reweld.
To remove and replace the concrete mixer hydraulic hose, pipe and refill hydraulic oil and check the system.